www.1o13.cn-欧美精品黑人性xxxx,草莓视频在线观看在线观看视频,免费一级欧美片在线观看欧美,国产精品视频免费看

    <ul id="uy60q"></ul>
    <ul id="uy60q"></ul>
  • <ul id="uy60q"><pre id="uy60q"></pre></ul><ul id="uy60q"></ul>
  • Language:CHINESESENGLISH

    Homepage > Product > Green Steel structure Warehouse
    Contact Us
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:梁先生/Mr Leung
    • Phone:18900873383/18900873268
    • E-mail:sbs@sbsprefabhouse.com
    • Skype: sbs-Candy
    • URL:http://www.1o13.cn

    Green Steel structure Warehouse

    Green Steel structure Warehouse

     

     

    Prefabricated steel structure warehouse

    1.Engineering cases:

     

     

    2.The detail material for the steel structure:

    The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate .

    3.Commonly used steel materials and the performance of the steel:

    1) carbon structural steel: Q235B, Q345B, etc.

    2) high strength low alloy structural steel;

    3) high quality carbon structural steel;

    4) alloy structural steel special steel;

    5) special purpose steel;

    6) walls and roofing material is optional: corrugated steel plate, EPS sandwich panel, rock wool sandwich panel and polyurethane sandwich panel

     

    4.Guidance installation

      Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
    Customer should provide:
    1) Translator or assistant on site.
    2) All costs raised including:
    A. visa fee
    B. Round trip flight ticket
    C. Accident insurance for the supervisor during the period
    D. Accommodation
    E. Daily meals
    F. Internet
    G. Local traffic fee (if any)
    3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
    4) Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
    There have some guidance installation picture:

     

    Contact way

    1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
    2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
    3)Foshan, Guangdong Province, China
    4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

     

    Hits:13220 Time:[2020-2-26]

    Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
    国产三级视频在线观看视| 欧美日本激情视频一区二区三区| 国产福利在线观看不卡最新| 久久久天堂| 中文字幕无码人妻视频| 2021国产精品自在自线| 久久99精品国产麻豆不卡| 色婷婷久久久SWAG精品| 亚洲高清一区二区三区电影| 无码人妻少妇色欲av一区二区|