www.1o13.cn-欧美精品黑人性xxxx,草莓视频在线观看在线观看视频,免费一级欧美片在线观看欧美,国产精品视频免费看

    <ul id="uy60q"></ul>
    <ul id="uy60q"></ul>
  • <ul id="uy60q"><pre id="uy60q"></pre></ul><ul id="uy60q"></ul>
  • Language:CHINESESENGLISH

    Homepage > Product > Floor boards
    Contact Us
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:梁先生/Mr Leung
    • Phone:18900873383/18900873268
    • E-mail:sbs@sbsprefabhouse.com
    • Skype: sbs-Candy
    • URL:http://www.1o13.cn

    Floor boards

    Floor boards

    Floor decking steel sheet
    Floor deck means pressed steel plate not only as a permanent template of concrete floor, but also as load-bearing bar at the bottom of the floor to participate in the stress calculation, to work together with concrete to form a composite floor slab. 

    Performance of composite floor slab: Saving a lot of temporary template; Leaving out all or part of the template support; Cut concrete dosage; Lighten permanent load of the structure; Saving a lot of labor force in transport, storage and installation, which has more important significance in both high-rise buildings and seismic regions; Reducing the workload; Easy laying pipelines of communication, electric power and heating; Also easy laying of heat preservation, sound insulation, heat insulation and vibration isolation material; Improving the floor performance; full playing good steel's tensile strength and ductility and concrete's compressive strength and large stiffness. 
     

     

    Name

    Modle

    Picture

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    Open-type  Floor Deck Sheet

    YX70-200-600 

    0.8

    89.35

    23.7

    0.9

    103.5

    25.7

    1.0

    118.6

    31.6

    1.2

    149.8

    40.01

    YX75-200-600 

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.6

    60.38

    16.42

    0.8

    76.57

    20.31

    1.0

    100.64

    27.37

    1.2

    128.19

    35.96

    YX75-293-880

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.7

    102.3

    23.481

    0.9

    122.8

    29.52

    1.2

    164.4

    40.464

    1.5

    205.5

    50.313

    YX76-344-688

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.8

    91.62

    23.46

    1.0

    119.38

    30.61

    1.2

    142.01

    38.98

    1.4

    167.34

    43.90

    1.5

    178.70

    46.80

    YX51-253-760

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.8

    53.80

    19.30

    1.0

    67.30

    24.20

    1.2

    80.80

    29.20

    YX51-240-720

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.8

    47.52

    17.9

    0.9

    53.8

    20.1

    1.0

    58.1

    22.9

    1.2

    68.7

    28.4

    YX51-304-914

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.8

    106.6

    24.46

    1.0

    127.9

    30.76

    1.2

    171.3

    42.15

    1.5

    214.1

    52.41

    Close Type Floor Decking Sheet

    YX65-185-555

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.8

    53.95

    25.614

    1

    67.44

    32.018

    1.2

    80.928

    36.02

    Dovetail Type Steel Floor Sheet

    YX51-190-760

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.8

    54.803

    14.42

    1.0

    68.504

    18.02

    1.2

    82.204

    21.63

    1.5

    102.756

    27.04

    YX51-200-600 

     

    Thickness(mm)

    Moment of inertia cm3/m

    Section of modulus cm3/m

    0.8

    54.803

    14.42

    1.0

    68.504

    18.02

    1.2

    82.204

    21.63

    1.5

    102.756

    27.04


    Note: Matters needs attention in floor deck installation 
    Column grid spacing generally is 5~9.0m*8~15m and steel structure beam spacing is 3m. Fabrication length of floor deck is 4.97~8.97m. Transport, ation and installation are more difficult, especially for floor deck with arc vertical hoisting. It is difficult to coat between the beams and narrow down, which also disrupts the second beam welding normal working procedure. Fabrication length is limited to 3~6m, which can avoid lifting problems of secondary girder in vertical transportation. When using special soft sling in hoisting, one should check whether the soft slings are torn or cut off. When floor deck is placed aside the steel beam, it should avoi, , , d probe. When operating, personnel should wear seat belts and ensure that sides' parts are on the perimeter security line. Before using penetration welding spot in welding connection, one should prepare leftover material arc welding, adjust welding current adjustment. Because of no horizontal template and the vertical support plate at the bottom of the floor deck, material should not be too concentrated when watering the concrete. It adopts the planar vibrator and apportions vibrating in a timely manner.

    Hits:9372 Time:[2020-2-26]

    Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
    精品一区二区三区| 国产成人欧美精品视频APP| 日韩成av人片免费观看| 国产成人精品A视频| 飘雪影视大全免费观看视频| 日韩无码国语对白| 欧美野外疯狂做受XXXX高潮| 亚洲国产成人久久一区二区三区| 国产无遮挡又黄又爽在线观看| 成人字幕网视频在线观看|