www.1o13.cn-欧美精品黑人性xxxx,草莓视频在线观看在线观看视频,免费一级欧美片在线观看欧美,国产精品视频免费看

    <ul id="uy60q"></ul>
    <ul id="uy60q"></ul>
  • <ul id="uy60q"><pre id="uy60q"></pre></ul><ul id="uy60q"></ul>
  • Language:CHINESESENGLISH

    Home > News > How to ensure the completion of steel structure project on time
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.1o13.cn

    How to ensure the completion of steel structure project on time

    Time:[2016-11-9]  Hits:4704

       The construction of a steel structure, completed within the specified period is a commitment to the enterprise, but to ensure the completion of this task, it must not be a good commander. So today by the Guangzhou Steel Company commander to share with you more.
           1, in the construction of the total duration as the goal to stage control plan to ensure the use of effective internal and external conditions for enterprises to take dynamic management to make the construction of a scientific and rational organization to ensure that the plan on schedule or ahead of schedule.
            2, fully prepared before the start of the preparatory work.
            3, conscientiously do a good job in the drawings of the trial work will be found in the technical settlement to resolve, to avoid the construction due to design changes and delay the construction period, the timely preparation of practical construction design and construction of major sub-project construction design for continuous construction operations to provide reliable guarantee .
            4, daily production scheduling meeting, daily inspection, if any delay by increasing labor force measures in time to solve the human, machinery, material supply and other problems timely coordination by the company to solve.
           5, the last is the most important, internal and external communication and coordination.
          How to ensure that steel works completed on schedule, the above is given today to share. Want to learn more, Shengbang Guangzhou Steel Structure Company welcomes you!
    Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
    av在线一区二区三区四区| 国产成a人亚洲精v品在线观看| 51吃瓜今日吃瓜必吃| 久久精品午夜福利| 精品一区二区三区av天堂| 久久午夜夜伦痒痒想咳嗽P| 精品国产午夜理论片不卡| 男女夜晚污污18禁免费| 国产精品永久久久久久久久久| 精品一区二区三区影院在线午夜|